From: route@monster.com
Sent: Friday, April 08, 2016 12:13 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
BENJAMIN OKPERE, PMP 10555 FONDREN ROAD, APT 1427Phone:
312-918-7939 HOUSTON, TX 77096 Email:
benjamino1010@yahoo.com PROFESSIONAL
SUMMARY: Resourceful project Engineer with extensive
experience in project management planning, scheduling, controls and delivery
on civil/construction projects, oil and gas projects and telecommunications
infrastructure deployment projects: including site acquisition, preparation,
surveying, geotechnical site investigation, project supervision, equipment
installation, inspection, commissioning and quality control system.
TECHNICAL SUMMARY: ·
Microsoft
Office Suites including MS Project ·
Primavera
P6 ·
AutoCAD
2D&3D design EDUCATION: ·
University
of
Lagos
BSc (Hons) - Civil Engineering CERTIFICATION: ·
Project
Management Professional PMP ·
OSHA
Construction Safety and Health ·
Oracle
Database 10g Administrator Certified Associate
PROFESSIONAL EXPERIENCE: GLOBAL
INSPECTION ENGINEERING SERVICES
Nov.2013–Sept.
2015
Houston
TX ROLE: Project Scheduler
· Project planning, scheduling and controls using primavera
P6 · Develop baseline project schedules with input from
multiple work groups by translating the project scope of work into
deliverables and milestones · Ensure project activities are logically tied - provided
sequencing recommendation · Work with field and division leaders especially the
project manager to receive work schedule updates for daily and weekly
schedule updates · Identify critical project metrics to track in order to
monitor project progress · Attends project meetings to obtain schedule updates,
determine resource needs, change control, schedule variance and updating
schedules based on meeting information · Maintain project schedules and provides progress updates
as required · Provide schedule forecasts and identify areas of weakness
and establishes means and methods for recovery, if any, as well as new
critical activities · Prepare manpower histograms and resource leveling · Develop summary schedule reports for senior management · Perform job audits to validate actual progress vs.
reported · Perform project closeout with summary schedule statistics
MYD
TELECOMS
LIMITED
Jul. 2011 – Nov 2013 Nigeria ROLE:
Project
Engineer
·
Project
planning and scheduling of project activities for smooth project
delivery to meet with the company strategic goal, project requirement and
customer satisfaction ·
Contract
documents (Drawings, BOQs, Conditions of Contract) analysis ·
Provided task
leaders and project management with clear, timely, and accurate schedule
information to make informed decisions ·
Status and
reporting progress of all site activities from contract award to contract
closeout through engineering, procurement, construction, commissioning, and
project management phases of work ·
Used MS
Project to develop resource loaded schedules with the project team,
including critical path analysis, alternate schedules and progress
measurement of the schedule. ·
Ensured that the project is realistic at all time to
include all the scope of work and represent the current progress of
activities at site. ·
Maintained
and supported EVMS (Earned Value Management Systems) process for projects. ·
Provided EVMS
support to management in compliance with contractual requirements and
customer reporting processes. · Worked and liaised cross-functionally with
stakeholders in other to identify and resolve job compliance issues that may
impact negatively on the project ·
Performed
other duties as assigned or required. GLOBACOM
LIMITED
Jun. 2007 –Jul. 2011 Nigeria ROLE:
Project Rollout
Engineer
·
Oversaw
the roll-out programs for the company from preliminary network
design ( PND), city survey , site acquisition and documentation, line
of site (LOS), technical site survey (TSS), final site survey report (FSSR),
site build , equipment deployment and installations, commissioning and
integration to the network · Ensured the efficient management and balancing of
the enhanced triple constrains of scope, time, cost, quality, risk and
customer satisfaction in meeting with the project requirement ·
Managed
the overall work load requiring daily supervision by scheduling site
inspections adequately in other of priorities ·
Coordinated
cross functional activities in other to complete specific project
activity as scheduled in the project management plan with effective
communication management plan ·
Initiated
over 400 sites by conducting viability analysis of potential site
coverage for the Globacom network capacity growth ·
Worked
closely with the network planning department, OMCR in RF design, creation and
implementation of new sites for coverage expansion and quality service
delivery to our esteemed customers ·
Built
over 200 numbers of 2G/3G sites by effectively monitoring and
controlling the site built processes including civil/ tower foundation
work , electro-mechanical works, RF, BSS/ TX, BTS/MW link installation
implementation ·
Provided
technical supervision to subcontractors while carrying out specialized
equipment installations, like RF feeder and sectorial antennae installation
on the tower, microwave link antennae installation and alignment, base
transceiver station (BTS), transmission rack, testing and commissioning,
rectifier and battery power back-up, VSWR test on feeders, line of site (LOS)
validation, generators, MDB, alternative transfer switch (ATS),
and other electrical installations ·
Managed
site built contractors for continual improvement by periodic assessment
and appraisal for management performance tracking, including equipment
vendors like Ericsson, Huawei, Alcatel, ZTE, Ceragon ·
Supervision
of fiber optics laying/installation and cross-connection for transmission of
data, & voice services on 3G and routing of Huawei RNC (Radio Network
Controller) supervision to OMC (Operations and Maintenance Centre). ·
Ensured
the compliance to health, safety and environment standard on all job
sites ·
Closed
over 200 sites by conducting site acceptance with the approved scope and
approved changes, and signed the final acceptance certificate FAC SERVETEK
ENGINEERING
LTD
Mar. 2006 –May. 2007 Nigeria ROLE:
Civil
Engineer
·
Surveyed
and established reference points and elevations to guide building
construction ·
Determined
strength and adequacy of concrete and foundations using the cube crushing
test or the non-destructive test ·
Supervised
the construction of both residential and commercial buildings ·
Supervised
road grading, drainage construction and sub-contractor works ·
Daily
and weekly site progress report writing and construction milestone
documentation ·
Prepared
As-Built drawing for all sites as part of project closing
documentation ·
Carried
out scope compliance check and site acceptance with the client LIKUSASA
NIG LTD
Dec. 2004- Mar.2006 Site
Engineer
·
Conducted
site search with approved coordinates, site acquisition and proper
documentation ·
Conducted
technical site survey (TSS) for new sites to generate site specific
requirement and working drawings prior to start up meeting (SUM) ·
Carried
out soil test using the deep cone penetrometer test for foundation
specification and design ·
Construction
of different types of foundations: Pile, Raft, Pad and column for towers ·
Dealing
with the logistics of site build and site workers coordination ·
Construction
material and construction equipment deployment ·
Site
setting out based on approved working drawing from the client ·
Supervised
tower rigging and carried out tower certification (torque test ) and
acceptance ·
Constructed
reinforced concrete retaining walls, equipment slabs with the appropriate
concrete strength and steel palisade fence ·
Grounding
system installation on site and testing using the earth meter
tester ·
Backfilling
and compaction of soil within the site perimeter to the required strength ·
Masonry
work, landscaping and site cleaning prior to closing and handover MEMBERSHIP: ·
Member
PMI: Project Management Institute 3060964. ·
Engineer
In Training (EIT) exam preparation in progress ·
Registered
Engineer with COREN: Council for the Regulation of Engineering in
Nigeria R.21, 473. ·
Corporate
Member: The Nigerian Society of Engineers 24880. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|